Home

WELCOME!

Our name is our philosophy. Since it was founded in 2003, ENERTEC GmbH has been successfully providing full support for energy systems. From the concept to the first planning sketch to commissioning: Everything from a single source.

 

Our entire team has many years of experience in the construction of energy systems and can

 

  • Design and layout

  • Planning and detailed construction

  • Project management, project monitoring and project management

  • Installation supervision and commissioning

 

cover.

 

In addition, ENERTEC supplies the necessary core components such as:

 

  • Grate combustion systems from 10 MW to 50 MW thermal output

  • Dust incineration systems up to 25 MW thermal output

  • Thermal oil heater systems up to 20 MW transmission capacity

  • Conveyor units

 

in the best quality at low prices

PROJECTS

13.02.2021

New conveying system for CF2P

At the Lure (F) location, Compagnie Francaise du Panneau SAS (CFP) a particle board plant, whose Staff since the start of operations of the modernized Energy systems in 2001 is supported by Enertec employees in many ways. On one last year's investment decision of the new Operator after taking over the IKEA plant in 2018, Enertec received the order for Renewal of various conveyor units in the years of fuel and ash conveying lines of the biomass hot gas generator. in the January of this year were delivery and assembly from Enertec for 2 fuel conveyors, one Wet ash conveyor and a fuel shaft completed and the heat supply of the site went after only a week of planned downtime back in operation

07.11.2017

Engineering contract for Dieffenbacher

ENERTEC has again taken on a planning order for an energy system for DIEFFENBACHER GMBH. ENERTEC is responsible for the detailed planning of the entire system for Thien Lam Dat JSC (Vietnam). The system includes moving grate firing, dust and fiber injection firing with a total firing capacity of 38 MW and, on the consumer side, a thermal oil boiler with a good 14 MW (with indirectly heated steam generator) and the residual heat for direct fiber drying

28.10.2015

Granulate injection furnaces for Kablitz to Burgos

In a follow-up order, Enertec is supplying 2 more granulate injection firing systems to Richard Kablitz & Mitthof GmbH. The systems that are identical in terms of combustion performance to the preliminary project will be installed at Kronospan S.I Burgos (E)

NEWS

30.08.2024

IKEA gets a new radiation part for a waste heat boiler

240 meters of pipe are installed in the so-called radiation part for an existing waste heat thermal oil boiler, which is currently being delivered by Enertec to IKEA in Poland. The 6 x 3 x 3 meter large and approx. 7 ton heavy component was manufactured within 8 weeks in collaboration with our proven suppliers, as our customer urgently needed a replacement

08.07.2024

Feedwater preheater to Wittstock

A flue gas/water heat exchanger as a feedwater preheater left our production facility at the end of May for Heiligengrabe. The component must be imagined as being similar to the photomontage below, in which a heat output of approx. 2400 kW is transferred to the feedwater in a steam boiler system in a pipe coil surrounded by flue gas

08.01.2024

Telephone availability restored

After a few days of limited phone availability for our employees due to a technical problem with our provider, we can now be reached again